Retail & restaurant
Retail and restaurant construction in Calgary
Your shop or restaurant designed, engineered, permitted and built by one firm, with the schedule worked backwards from your opening date.
The problem
Rent starts before you open
A retail or restaurant lease usually starts costing you money before the doors open. Every week the build runs late is a week of rent with no sales.
That's why we build the schedule backwards from your opening date, and plan the permits and inspections into it from the start instead of discovering them midway. Retail and restaurant spaces are customer-facing, so they have to meet health code, fire code and City of Calgary requirements as well as look right.
What we build
Retail fit-outs in Calgary
Retail build-outs usually mean display systems, signage walls and cashier counters, plus the electrical, lighting, flooring and finishes that make a unit read as your store. We handle every trade under one project manager.
[ask Vista: retail types you've built (boutiques, salons, showrooms, grocery, other) and the typical size range]
What we build
Restaurant build-outs in Calgary
Restaurant conversions mean commercial kitchens, exhaust systems and plumbing upgrades, the parts that decide whether a space can serve food at all. These are engineering-heavy, which is where in-house structural, mechanical and electrical engineering saves time.
[ask Vista: which restaurant-specific scopes you do and which go to licensed specialists, e.g. kitchen exhaust, grease management, fire suppression, gas]
[ask Vista: what a restaurant owner needs from Alberta Health Services or the City before opening, and who applies for it]
Permits
Permits for a retail or restaurant fit-out
Most interior commercial work beyond cosmetic changes needs a City of Calgary building permit. That includes:
- Adding or removing walls
- Electrical or plumbing upgrades
- HVAC modifications
- Changes to fire alarm or sprinkler systems
- Structural alterations of any kind
Permits
We manage the permit application
A restaurant conversion touches several of those at once. Skipping the permit can mean fines, forced removal of unpermitted work or insurance problems. We prepare the drawings, coordinate the engineering and manage the permit application with the City on your behalf.
[ask Vista: do restaurant and retail jobs need any permit or approval beyond the building permit? Name them.]
Before you sign
Before you sign, let us look at the space
A space that was a salon or an office isn't automatically a space that can run a kitchen.
Send us the address and the lease details and we'll review the space with you before you commit, free and with no obligation.
What the review checks
- 01[ask Vista: what the review checks for a restaurant (power, gas, ventilation, grease, parking, zoning)]
- 02[ask Vista: what the review checks for a retail unit]
Free, no obligation.
Book a Free Pre-Lease ReviewAlready have drawings or a signed lease? Send them and we'll come back with a scoped budget and schedule.
How it works
How a retail or restaurant build-out runs with us
-
We meet you, look at the space and talk through your business, timeline and budget.
-
We prepare drawings, coordinate engineering and manage the City of Calgary permit application.
-
One project manager runs every trade on site: framing, electrical, plumbing, HVAC, flooring, ceilings and finishes.
-
City inspections, a final walkthrough with you, deficiencies fixed, and a clean space handed over ready for business.
Budget and timeline
What a retail or restaurant build-out costs
The honest answer is that it depends on the space. A restaurant with a commercial kitchen and exhaust needs far more engineering and plumbing than a retail unit that needs new finishes and a counter. A site-specific budget is the only reliable number, and the estimate is free.
[ask Vista: planning ranges per sq ft or typical timelines for retail and for restaurant, if they'll publish them]
Proof
Recent work
Beauty salon, 2,000 sq ft, [ask Vista: neighbourhood]. Design, drawings, permits, construction and inspections, completed in 3 months. It was the owner's third location.
"They handled drawings, permits, construction, and inspections. The entire process took 3 months. This was our 3rd location and we were impressed with their communication and timely updates." [ask Vista: owner name and permission to use it], [ask Vista: salon name]
[ask Vista: a real restaurant or café project: size, timeline, scope, photos]
- COR certified
- Licensed & insured in Alberta
- In-house structural, mechanical and electrical engineering
Questions
Retail and restaurant questions
Usually, yes. Walls, electrical or plumbing upgrades, HVAC changes and fire alarm or sprinkler work all need one. Cosmetic work like paint doesn't. We'll tell you what your plan needs when we see it. [ask Vista: any approvals beyond the building permit for restaurants]
We schedule backwards from it, and we'll tell you early if the date and the scope don't fit. Permits and inspections are part of the schedule, not extras on top.
We manage every trade under one project manager, and commercial kitchens, exhaust systems and plumbing upgrades are standard restaurant conversion work. [ask Vista: which are done by your crew and which by licensed specialists]
Yes. We plan the schedule around them.
It depends on the scope and the approvals. Our salon project took 3 months from design to handover. [ask Vista: typical range for retail and for restaurant]
A site-specific budget is the only reliable number. The estimate is free once we've seen the space.
Related
Also see
Part of our tenant improvement service. See also our wider commercial construction work.
Opening a clinic instead? See Medical & Dental Clinics.
Further reading: Commercial tenant improvement in Calgary: what to know before you sign
Next step
Planning a shop or restaurant?
Send us the address before you sign. We'll tell you whether the space can work and what it will take.