Residential & commercial
Building Permit Drawings & Engineering in Calgary
Architectural and interior design, plus structural, mechanical and electrical engineering, stamped by a licensed P.Eng on our team. Order the drawings on their own, or have us build it too.
- COR certified
- Licensed & insured in Alberta
- In-house engineering
- Permits handled with the City of Calgary
Permit drawings
Drawings that get through the permit counter
Structural changes, new builds and major renovations often need stamped drawings before the City of Calgary will issue a permit. Drawings that are late, incomplete or done by someone unqualified mean rejected applications, redesigns and delays.
We prepare the drawings, our in-house P.Eng completes and stamps the engineering, and we submit the permit application for you. When we also build it, the people who drew it are the people who build it, so nothing gets lost between the drawing and the site.
Services
Engineering and design services in Calgary
-
Load-bearing wall removals, basement underpinning and full structural design for new commercial builds, with stamped drawings ready for your City of Calgary permit.
-
From concept and space planning to detailed construction drawings, built to Alberta building code. Design and engineering happen in one team, so there’s no back-and-forth between separate consultants.
-
Heating, cooling, ventilation and plumbing design for offices, clinics, retail spaces and homes. Clinics and restaurants depend most on these systems, so we get them right before the layout is fixed.
-
Electrical system design, fire alarm systems, lighting layouts and power distribution to Alberta’s electrical code, with stamped drawings and our own crew building it.
-
Foundation design for new builds, additions and underpinning, sized to your building’s loads and soil conditions, with stamped drawings for your City of Calgary permit.
Design
When you need a designer as well as an engineer
Engineering makes a space safe and ready for permit. Design makes it work for you. Planning both early lets the layout, finishes and lighting fit the budget, instead of being patched in later.
- You're changing a space's use, such as retail to office or office to clinic
- The layout is congested, short on storage or no longer fits how you operate
- It's a clinic or other specialised use, where lighting, acoustics and way-finding matter
Permits
Calgary building permit drawings: who needs them
When do you need a building permit? For almost any commercial or residential work beyond cosmetic changes. That includes adding or removing walls, electrical or plumbing upgrades, HVAC changes, fire alarm or sprinkler changes, basement suites, and any structural work.
When do the drawings need an engineer or architect's stamp? It depends on the building’s use, its number of storeys and its total size, not just the size of your space. The City of Calgary can also require stamped drawings for complex work, like a change of use, an addition or a mezzanine. Our P.Eng reviews your project, tells you what’s required and stamps the drawings as part of the same contract.
Which permits will I need? Many projects need more than one: a development permit for a change of use, a building permit for the work, and trade permits for electrical, plumbing and gas. We tell you which ones apply before you start.
How it works
From site visit to stamped drawings
- 01
Consultation and site review
We visit the space or site, learn what you need and talk through design, timeline and budget.
- 02
Design and engineering
We prepare the design and engineering drawings, check every discipline against the others, and our P.Eng stamps them.
- 03
Permit application
We submit the permit to the City of Calgary and respond to reviewer comments until it’s approved.
- 04
Build, if you want us to
One project manager runs every trade and the City inspections. Or take the stamped drawings to any contractor you choose.
Questions
Permit drawing and engineering questions
Often, yes. It depends on the building’s use, its number of storeys and its total size, and the City can also require stamped drawings for complex work like structural changes or a change of use. We’ll tell you what your project needs once we’ve seen it.
Yes. We prepare the design and stamped engineering drawings and can submit the permit for you. You can take the drawings to any contractor, or have us build it too.
Yes. Removing a load-bearing wall is structural work and needs a building permit with engineered drawings. Our P.Eng designs the beam and supports and stamps the drawings for your permit.
Almost every tenant improvement and commercial renovation needs three sets of drawings: architectural for the layout, mechanical for heating, ventilation and plumbing, and electrical for power, lighting and fire alarm. Structural engineering is added when the work changes the structure, like new openings in load-bearing walls, mezzanines or heavy equipment. A Pre-Lease Review shows exactly what your space needs before you sign. Let's see the Pre-Lease Review.
For alterations, typically 21 to 49 days, depending on how complete the application is. A development permit for a change of use adds time. See our clinic build-out guide.
It depends on the scope of the project. For a number you can rely on, we give a free estimate.
Yes. We design and engineer both, includingresidential additions, wall removals and basement underpinning.
It depends on the size and type of project. We’ll give you a delivery date with your quote.
Next step
Tell us what the City is asking for
Send us the address and what you want to change. We’ll tell you which drawings you need and what they’ll cost.